COMPLETE STREETS

The Complete Streets concept is an initiative to design and build roads that adequately accommodate all users of a corridor, including pedestrians, bicyclists, users of mass transit, people with disabilities, the elderly, motorists, freight providers, emergency responders, and adjacent land users. This concept dictates that appropriate accommodation(s) be made so that all modes of transportation can function safely and independently in current and future conditions.

Meridian Street - Downtown Anderson
Downtown Anderson, Indiana - Meridian Street


RESOURCES
Complete Streets Coalition
National Complete Streets Coalition Website


Complete Streets PowerPoint (PDF)

Example Photos

TGM - Street Design Basics

Livable Communities - Complete Streets

MCCOG DOCUMENTS:
MCCOG Complete Streets Policy (PDF)

Resolution 5-10 Complete Streets (PDF)

 
 
GOALS: The goals of this Complete Streets Policy are:

1) To ensure that the safety and convenience of all users of the transportation system are
accommodated, including pedestrians, bicyclists, users of mass transit, people with disabilities,
the elderly, motorists, freight providers, emergency responders, and adjacent land users;
2) To incorporate the principles in this policy into all aspects of the transportation project
development process, including project identification, scoping procedures and design approvals,
as well as design manuals and performance measures;
3) To create a comprehensive, integrated, and connected transportation network that supports
compact, sustainable development;
4) To ensure the use of the latest and best design standards, policies and guidelines;
5) To recognize the need for flexibility to accommodate different types of streets and users;
6) To ensure that the Complete Streets design solutions fit within the context(s) of the community.
APPLICABILITY: The Complete Streets Policy shall apply to all of the following:

1) New construction and reconstruction (excluding resurfacing activities that do not alter the
current/existing geometric designs of a roadway) of local roadways that will use Federal funds through the MCCOG for any phase of project implementation including planning, design, rightof-way acquisition, construction, or construction engineering.
2) Local roadway projects included in the TIP after the adoption of the Complete Streets Policy AND that are not Ready-for-Letting at the time this policy is adopted.
3) Local roadway projects where the MCCOG has the programming authority to allocate Federal funding.


 
 
 
     